← News
2026.07
Fission-A Full Structure Design Completed, TRON-001 400s Cumulative Testing

In July 2026, the Fission-A prototype completed full structural design. TRON-001 cumulative hot-fire testing across multiple conditions reached 400 seconds.
2026.07

In July 2026, the Fission-A prototype completed full structural design. TRON-001 cumulative hot-fire testing across multiple conditions reached 400 seconds.