← News
2027.Q2
TRON-001 Planned Low-Rate Production, Fission-A First Stage Planned Assembly
In Q2 2027, TRON-001 is planned to achieve low-rate initial production. The Fission-A first stage is scheduled to complete manufacturing, assembly, and multiple ground static tests.
